Enter your patio size, paver and pattern. You get the paver count with the right extra for cuts, everything that goes underneath, edging, and how deep to dig — with a preview of the pattern in your color.

Your patio

1. Size
Length (along the house)
ft
in
Width (out from the house)
ft
in
2. Pavers
Pattern
Color (for the preview)
3. Base & joints

Pavers

949

4.50 per sq ft

Patio area

192 sq ft

dig 7 3/8"" deep

Base stone

4.0 t

4" compacted

Joint sand

5 bags

polymeric, 50 lb

Pattern preview

Herringbone 90° · Tan blend
House

What goes under it

Pavers2 3/8""
Bedding sand1""
Compacted base4""
Landscape fabric on firm soil

Dig 7 3/8"" below finished height and slope the base about 1/4" per foot away from the house.

Shopping list

  • ✓Pavers, 4" x 8" brick / holland: 949 (823 field + 126 border) incl. 10% for cuts
  • ✓Paver base (crushed stone, 3/4" minus): 4.0 tons ≈ 2.84 yd³ loose for 4" compacted
  • ✓Bedding sand (coarse, C33): 0.80 tons or 32 x 50 lb bags (1" screeded)
  • ✓Polymeric joint sand: 5 x 50 lb bags (+1 for touch-ups)
  • ✓Edge restraint: 40 ft — 5 x 8 ft sections and 40 x 10" spikes
  • ✓Landscape fabric, plate compactor (rent), screed pipes, rubber mallet, masonry saw or splitter

Base and sand depths follow ICPI / CMHA guidance for sand-set pavers. Driveways and clay soils may need more — ask your supplier.

How many pavers do I need?

Divide the patio area by the face area of one paver, then add extra for cuts. A 4" x 8" paver is 0.222 sq ft, so it takes 4.5 per square foot. A 20' x 15' patio is 300 sq ft: 1,350 pavers, or 1,418 with 5% extra for a running bond.

PatternExtra for cutsNotes
Running or stack bond5%Cuts only at the edges.
Basketweave5–7%Needs 2:1 pavers like 4" x 8".
Herringbone 90°10%Strongest pattern; best for driveways.
Herringbone 45°15%Every edge paver is an angled cut.

What goes under pavers

Pavers sit on 1" of coarse bedding sand, screeded flat but not compacted, over a compacted crushed-stone base. Patios and walks usually get 4" of base; poor or clay soil 6"; driveways 8" or more. Compacted stone takes up less room than it does in the truck, so order about 20% more than the finished volume. Dig deep enough for the base, the sand and the paver, and slope everything about 1/4" per foot away from the house.

Edging and joint sand

Every side that isn't held by a wall or slab needs edge restraint, spiked about every foot, or the pavers slowly spread. Once the pavers are down and compacted, sweep polymeric sand into the joints and mist it. A 50 lb bag covers roughly 40 sq ft with standard 1/8"–3/16" joints — more with tight joints, less with wide ones.

Pouring a slab instead? Try the concrete calculator. Building a deck next to the patio? See the deck board calculator.